Maintenance Notifications
Planned Network Maintenance – Estimated Service Interruptions
To improve infrastructure reliability, planned switch replacements and network updates will be performed across YCOE and its partner districts. All times are estimates, and every effort will be made to pre-configure equipment in advance to minimize disruption. Actual cutover times are expected to be under 10 minutes per switch, with switches activated one at a time. As a precaution, legacy equipment will be retained and kept operational for two weeks in case fallback is required.
YCOE Site Switch Replacements (Approx. 30 Minutes Each)
- GreenGate / Chavez / ECE JOC – Internet service will be temporarily unavailable during the switch transition.
- Dan Jacobs – Internet service will be temporarily unavailable during the switch transition.
- Plainfield SPED and ECE – Internet service will be temporarily unavailable during the switch transition.
District Interchange Switch Replacements (Approx. 30 Minutes Each)
- Esparto Unified – Full internet outage expected during the switch transition.
- Winters Joint Unified – Full internet outage expected during the switch transition.
YCOE Core Switches (Estimated 1–3 Hours)
During core switch replacements, access to centralized systems (such as QCC/QSS) and hosted services may be temporarily unavailable. Impacts by location include:
- Davis Joint Unified – Loss of access to QCC/QSS until switches are fully online.
- Esparto Unified – Loss of access to QCC/QSS and potential loss of access to services hosted by YCOE.
- Washington Unified – Loss of access to QCC/QSS until switches are fully online.
- Winters Joint Unified – Loss of access to QCC/QSS and potential loss of access to services hosted by YCOE.
- Woodland Joint Unified – Loss of access to QCC/QSS until switches are fully online.
- YCOE – Full internet outage until core switches are operational.
All-District Interchange Switch Replacement (Approx. 1 Hour)
All districts will temporarily lose access to the YCOE-hosted QCC/QSS system during final cabling transitions and data pathway re-establishment. Specific impacts include:
- Davis Joint Unified – Partial internet outage. Davis has dual internet providers, which should reduce the impact.
- Esparto Unified – Full internet outage.
- Washington Unified – Full internet outage.
- Winters Joint Unified – Full internet outage.
- Woodland Joint Unified – Partial internet outage. Woodland also has dual internet providers, minimizing impact.
- YCOE – Full internet outage.
Please plan accordingly and notify affected users in advance. Additional updates will be provided as work progresses.